Phase 1

Results: 5201



#Item
71Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 1-phase meter. Operating voltage applied for certification testing was 230V/50Hz.

Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 1-phase meter. Operating voltage applied for certification testing was 230V/50Hz.

Add to Reading List

Source URL: www.g3-plc.com

- Date: 2017-10-06 04:47:49
    72   Visterra Announces Publication of Clinical Data on VIS410 in the Journal EBioMedicine - Data from Phase 1 Clinical Trial Demonstrated VIS410 Generally Safe and Well Tolerated, Good Relative Exposure in Upper Respirat

      Visterra Announces Publication of Clinical Data on VIS410 in the Journal EBioMedicine - Data from Phase 1 Clinical Trial Demonstrated VIS410 Generally Safe and Well Tolerated, Good Relative Exposure in Upper Respirat

    Add to Reading List

    Source URL: www.visterrainc.com

    Language: English - Date: 2017-10-03 19:39:50
      73Nippon Signal awarded the Signaling system contract for Ahmedabad Metro project Phase 1 18th May 2017 Nippon Signal Co., Ltd.  Nippon Signal has been awarded the Signaling and Train control system contract by Metro-Expre

      Nippon Signal awarded the Signaling system contract for Ahmedabad Metro project Phase 1 18th May 2017 Nippon Signal Co., Ltd. Nippon Signal has been awarded the Signaling and Train control system contract by Metro-Expre

      Add to Reading List

      Source URL: www.signal.co.jp

      Language: Thai - Date: 2018-08-09 04:31:21
        74Valley View Staging Map_Stage 1 Phase 2

        Valley View Staging Map_Stage 1 Phase 2

        Add to Reading List

        Source URL: my5la.com

        - Date: 2016-11-21 17:04:38
          75Name:  Lunar Phase Simulator – Student Guide Part I: Background Material Answer the following questions after reviewing the background pages for the simulator. Page 1 – Introduction to Moon Phases

          Name: Lunar Phase Simulator – Student Guide Part I: Background Material Answer the following questions after reviewing the background pages for the simulator. Page 1 – Introduction to Moon Phases

          Add to Reading List

          Source URL: astro.unl.edu

          Language: English - Date: 2009-12-31 17:08:00
            76Rutgers  iJOBS  Phase  2  Frequently  Asked  Questions   1)   2)   3)  

            Rutgers  iJOBS  Phase  2  Frequently  Asked  Questions   1)   2)   3)  

            Add to Reading List

            Source URL: ijobs.rutgers.edu

            Language: English - Date: 2018-03-31 22:45:40
              771  Faculty Development Phase I Syllabus - FY19 Instructors: Dr. Benita Moore, ,  Karen Howard, ,

              1 Faculty Development Phase I Syllabus - FY19 Instructors: Dr. Benita Moore, , Karen Howard, ,

              Add to Reading List

              Source URL: teched.tcsg.edu

              Language: English - Date: 2018-05-22 14:10:10
                78Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator. Testing was performed on phase 1. Testing was performe

                Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator. Testing was performed on phase 1. Testing was performe

                Add to Reading List

                Source URL: www.g3-plc.com

                - Date: 2017-06-14 01:59:51
                  79Yaesu FTDX-5000D NPR & TX Phase Noise Test Report FW Ver. AH036H012NovemberA. Farson VA7OJ/AB4OJ Test Conditions: SSB, B = 2.4 kHz, AGC Slow, ATT off, NB off, DNR off. Table 1: Noise Power Ratio (NPR), Mai

                  Yaesu FTDX-5000D NPR & TX Phase Noise Test Report FW Ver. AH036H012NovemberA. Farson VA7OJ/AB4OJ Test Conditions: SSB, B = 2.4 kHz, AGC Slow, ATT off, NB off, DNR off. Table 1: Noise Power Ratio (NPR), Mai

                  Add to Reading List

                  Source URL: www.ab4oj.com

                  Language: English - Date: 2017-05-08 17:22:31
                    80Topics: 1. Research Fellow in the Active Ageing Index: Second Phase Project (AAI-II) 2. Call for abstracts BSGAge UK Invitation to Tender – Evaluation of Malnutrition Prevention Pilot Programme

                    Topics: 1. Research Fellow in the Active Ageing Index: Second Phase Project (AAI-II) 2. Call for abstracts BSGAge UK Invitation to Tender – Evaluation of Malnutrition Prevention Pilot Programme

                    Add to Reading List

                    Source URL: seminarioenvejecimiento.unam.mx

                    Language: English - Date: 2017-06-05 12:08:27